top of page
Search

LADWP Drinking Water Supply Permit Comment Period

The California State Water Resources Control Board Division of Drinking Water (DDW) and the Los Angeles Department of Water and Power (LADWP) invite you to participate in a public comment period and community meeting regarding the amendment of a drinking water supply permit that would allow LADWP to serve drinking water that has been treated by the North Hollywood West Wellhead Treatment Facility (Facility). This permit amendment would allow LADWP to use this state-of-the-art treatment facility to remove contaminations from the San Fernando Groundwater Basin, help to restore the beneficial uses of the basin, and restore LA's ability to safely operate the impacted drinking water wells in the North Hollywood West Well Field. Groundwater treated at the Facility will be blended with treated surface water from the Los Angeles Aqueduct Filtration Plant before being served to our customers. Join us at an upcoming community meeting to learn more.

Virtual Community Meeting:

Tuesday, December 5, 2023 at 6:00 PM Join online via Zoom Register at: https://bit.ly/NoHollywoodWest

Public Comment Period:

November 6, 2023 to December 15, 2023 You are invited to review and comment on documents related to the Division of Drinking Water’s issuance of a Drinking Water Supply Permit. Project documents are available at www.ladwp.com/remediation by selecting the North Hollywood West tab.


They can also be found at the following locations:

  • LADWP’s John Ferraro Building – 111 N Hope St. Room 1315

  • Valley Plaza Branch Library – 12311 Vanowen St.

  • Arroyo Seco Regional Branch Library – 6145 N. Figueroa Street

  • Alma Reaves Woods – Watts Branch Library – 10205 Compton Ave.



0 comments

Recent Posts

See All
bottom of page